No two power systems are the same; applications, loads, and environmental factors vary from site to site. While the guide below outlines our standard recommended preventative maintenance for the first 36 months of operation, we recognize that your facility may have unique demands. We are fully equipped to customize a service plan that specifically aligns with your equipment usage and uptime requirements.

Our Recommended 36-Month Maintenance Schedule:

  • PM1 – Quarterly
  • PM2 + 4hr Load Bank – Annual
  • PM3 – Every 3-6 Years
Q1Q2Q3Q4 Q1Q2Q3Q4 Q1Q2Q3Q4
PM1 ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔
PM2 ✔ ✔ ✔
PM3 ✔
Load Bank ✔ ✔ ✔
Service / Inspection Item Minor Service
(PM 1 / 31 Pt)
Major Service
(PM 2)
Major Service +
(PM 3)
Load Bank
31 Point Inspection (Click to Expand) ✔ ✔ ✔
Air Inlet System & Filter
Alternator
Barrel Insulation
Batteries
Battery Charger
Bearing(s)
Belts, Hoses & Connections
Block Heater
Breaker
Cold Water Leaks
Coolant & Coolant Filter
Crankcase Breather
Exhaust Manifold
Fan and Fan Drive
Fuel Filters – Prim/Sec
Fuel Lines & Connections
Fuel Tank & Rack
Gauges
Governor and controls
Jacket Water Heater
Oil & Oil Filter
Radiator
Remote Annunciators/Alarms
Safety Controls
Starter
Turbocharger
Valves and Valve Rotators
Vibration Isolators
Voltage
Water Pump
Water Separator
Additional Service Items
Collect Oil & Coolant Samples
Change Oil
Change Filters (Oil, Coolant, Fuel, Air)
Change Coolant
Change Rubber Hoses & Belts
Change Thermostats & Gaskets
Collect Fuel Samples Upon Request Upon Request Upon Request
Transfer Test Upon Request Upon Request Upon Request
Visual ATS Inspection Upon Request Upon Request Upon Request
Change Batteries Upon Request Upon Request Upon Request
Load Bank Tests
Accurate Temperature Gauge Test
Auto Start Test & Tag Verifications
Check Temperature with Heat Gun
Coolant Leaks
Engine Alternator Test
Full Rating Tests
Gauge Adjustment Tests
Gauge Compliance Tests
Oil Leaks
Pre-Alarm Verification
Shut Down Verification