When a Colorado healthcare facility needed to service three critical backup generators without risking power loss, they turned to Generator Source. We deployed a 1600kW temporary generator, enabling a seamless, two-day service of their primary units. The result: essential maintenance was completed with zero downtime and zero risk to the facility’s life-saving operations.

Units Featured:
1250kW Cummins Generator
600kW Cummins Generator
Screenshot 2025 07 29 130942 Case Study - Ensuring Zero Downtime for a Healthcare Facility

Generator Source specializes in providing solutions for customers who cannot be unsupported during preventative maintenance. Our comprehensive plan revolved around deploying a temporary power solution to ensure the facility remained fully protected.

  • Temporary Power Deployment: We deployed a 1600kW rental generator to the site to seamlessly shoulder the facility’s emergency power needs.
  • Sequential Servicing: Over a two-day period, our technicians meticulously performed the annual service and a full load bank test on each of the hospital’s three primary generators.