
NEW SURPLUS ARRIVAL
Sixteen 30kW
Generac Diesel
Generators. Zero
Hours. Ready to Ship.
A matched lot of new surplus Generac units, never placed into service, built on the reliable Perkins diesel platform and sound attenuated for quieter installs. In stock now at our Brighton, Colorado yard.
ABOUT THIS LOT
Every unit is new surplus with zero hours, a sound attenuated enclosure, a 200 gallon sub-base fuel tank, and a 12-lead reconnectable alternator. The shared specs are below. Voltage and amperage vary slightly by unit because the alternators can be wired for more than one configuration, so confirm those two on the individual listing or ask a rep to set them for your site.
Generator Set
Engine
Right-sized standby power for small commercial jobs
A 30kW generator is extremely versitile and covers a defined set of essential loads without paying for capacity you will not use. Common fits include:
Telecom & cell sites
Keeps radios, huts, and remote shelters online through utility outages.
Water & lift stations
Backs up pumps and controls at municipal and rural wastewater sites.
Retail & convenience
Protects refrigeration, POS, and lighting for small stores and stations.
Restaurants & grocery
Holds walk-in coolers and freezers to prevent inventory loss.
Small offices & clinics
Maintains critical circuits, servers, and life-safety systems.
Farm & agriculture
Runs irrigation, ventilation, and livestock systems during outages.

Showing 13 of 13 results
- More Details
Three-Phase
Fuel: Diesel
Loc: Brighton
Built: 2022
Volts: 120/240v
Hours: 0
Unit #: 093704
- More Details
Three-Phase
Fuel: Diesel
Loc: Brighton
Built: 2022
Volts: 120/240v
Hours: 0
Unit #: 093705
- More Details
Three-Phase
Fuel: Diesel
Loc: Brighton
Built: 2025
Volts: 120/208v
Hours: 0
Unit #: 093701
- More Details
Three-Phase
Fuel: Diesel
Loc: Brighton
Built: 2021
Volts: 120/208v
Hours: 0
Unit #: 093706
- More Details
Three-Phase
Fuel: Diesel
Loc: Brighton
Built: 2021
Volts: 120/208v
Hours: 0
Unit #: 093702
- More Details
Three-Phase
Fuel: Diesel
Loc: Brighton
Built: 2021
Volts: 120/208v
Hours: 0
Unit #: 093709
- More Details
Three-Phase
Fuel: Diesel
Loc: Brighton
Built: 2021
Volts: 120/208v
Hours: 0
Unit #: 093707
- More Details
Three-Phase
Fuel: Diesel
Loc: Brighton
Built: 2022
Volts: 120/208v
Hours: 0
Unit #: 093708
- More Details
Three-Phase
Fuel: Diesel
Loc: Brighton
Built: 2021
Volts: 120/208v
Hours: 0
Unit #: 093715
- More Details
Three-Phase
Fuel: Diesel
Loc: Brighton
Built: 2021
Volts: 120/208v
Hours: 0
Unit #: 093710
- More Details
Three-Phase
Fuel: Diesel
Loc: Brighton
Built: 2021
Volts: 120/240v
Hours: 0
Unit #: 093711
- More Details
Three-Phase
Fuel: Diesel
Loc: Brighton
Built: 2021
Volts: 120/208v
Hours: 0
Unit #: 093700
Request Quote
What buyers ask about new surplus
What does new surplus mean?
New surplus units were built by the manufacturer but never placed into service. They carry zero run hours and are functionally new, usually coming from cancelled projects or excess dealer stock. You get current equipment at a lower price, in stock today instead of on a factory lead time.
How fast can they ship?
All sixteen units are in stock at our Brighton, Colorado facility. We ship expedited across the United States and Canada, so delivery is measured in days rather than the months a new factory order can take.
Can I buy several as a matched fleet?
Yes. Because all sixteen share the same platform, they work well for multi-site rollouts, phased deployments, or keeping a spare that behaves exactly like the unit already running. Ask about pricing on multiple units.
Do you handle service, testing, and fuel?
We do. Generator Source offers load bank testing, preventative maintenance, and fuel delivery in house, along with a 31 point inspection process on our equipment. Talk to us about setting up service after delivery.
Need any assistance with finding a generator?
Contact our team today!













